This checklist is designed for you to use at the time of battery installation, before leaving the site. It helps set customers up for SmartShift, lowers the chance of post-install support issues, and speeds up referral payouts.
<aside>
<img src="/icons/arrow-right_green.svg" alt="/icons/arrow-right_green.svg" width="40px" />
If your customer has chosen Amber
follow this checklist to prepare their set-up for SmartShift.
If they haven’t yet chosen
you can still complete most steps to avoid re-work later if they decide to join.
By following these steps onsite, you reduce errors, prevent delays, and give customers a smoother experience.
</aside>
Brand-specific checks
<aside>
<img src="/icons/arrow-right_green.svg" alt="/icons/arrow-right_green.svg" width="40px" /> Click to jump to brand
AlphaESS / HIVE / REA Power
Enphase
Fronius
GivEnergy
Neovolt
Redback
Sigenergy
SolarEdge
Sungrow
Tesla
</aside>
Download printable PDF.pdf
❖ Sites with multiple brands of inverters
If the site uses different inverter brands (e.g. SolarEdge + Fronius), email [[email protected]](mailto:[email protected]?subject=Multi-brand%20inverter%20sources%20-%20CUSTOMER%20NAME&body=Customer%20name:%20ENTER%20CUSTOMER%20NAME%0AAddress:%20ENTER%20INSTALLATION%20ADDRESS%0ANMI%20(optional):%20ENTER%2010-DIGIT%20NMI%0AInstaller%20code:%20ENTER%20INSTALLER%20CODE%0A%0AData%20sources%20(select%20the%20most%20accurate%20system%20for%20each):%0A-%20Solar%20production%20data:%0A-%20Solar%20curtailment%20commands:%0A-%20Battery%20state%20of%20charge%20and%20charge/discharge%20rate:%0A-%20Battery%20charge%20or%20discharge%20commands:%0A-%20Household%20load%20data:%0A-%20Site%20import/export%20data:%0A%0ANotes:) with the most accurate source for each data stream to avoid onboarding errors
<aside>
<img src="/icons/arrow-right_green.svg" alt="/icons/arrow-right_green.svg" width="40px" />
Email [[email protected]](mailto:[email protected]?subject=Multi-brand%20inverter%20sources%20-%20CUSTOMER%20NAME&body=Customer%20name:%20ENTER%20CUSTOMER%20NAME%0AAddress:%20ENTER%20INSTALLATION%20ADDRESS%0ANMI%20(optional):%20ENTER%2010-DIGIT%20NMI%0AInstaller%20code:%20ENTER%20INSTALLER%20CODE%0A%0AData%20sources%20(select%20the%20most%20accurate%20system%20for%20each):%0A-%20Solar%20production%20data:%0A-%20Solar%20curtailment%20commands:%0A-%20Battery%20state%20of%20charge%20and%20charge/discharge%20rate:%0A-%20Battery%20charge%20or%20discharge%20commands:%0A-%20Household%20load%20data:%0A-%20Site%20import/export%20data:%0A%0ANotes:)
- Customer name, address, NMI
- For each signal, the brand or system that should be the source:
- Solar production data
- Solar curtailment commands
- Battery state of charge and charge or discharge rate
- Battery charge or discharge commands
- Household load data
- Site import or export data
</aside>
AlphaESS / HIVE / REA POWER

<aside>
<img src="/icons/arrow-right_green.svg" alt="/icons/arrow-right_green.svg" width="40px" />
Onsite Checklist
Check system compatibility
System Setup
- [ ] Remove time-based controls in Alpha Cloud settings
Step-by-step details
- [ ] Ensure firmware is up to date
- [ ] Ensure the timezone is correct and set to your nearest capital city in AlphaESS Cloud,(e.g. "(UTC+10:00) Canberra, Melbourne, Sydney".
- Please do not use the options in the "Australian Eastern Standard Time" format).
- Step-by-step details
- [ ] If customer has multiple brands of inverters, email [[email protected]](mailto:[email protected]?subject=Multi-brand%20inverter%20sources%20-%20CUSTOMER%20NAME&body=Customer%20name:%20ENTER%20CUSTOMER%20NAME%0AAddress:%20ENTER%20INSTALLATION%20ADDRESS%0ANMI%20(optional):%20ENTER%2010-DIGIT%20NMI%0AInstaller%20code:%20ENTER%20INSTALLER%20CODE%0A%0AData%20sources%20(select%20the%20most%20accurate%20system%20for%20each):%0A-%20Solar%20production%20data:%0A-%20Solar%20curtailment%20commands:%0A-%20Battery%20state%20of%20charge%20and%20charge/discharge%20rate:%0A-%20Battery%20charge%20or%20discharge%20commands:%0A-%20Household%20load%20data:%0A-%20Site%20import/export%20data:%0A%0ANotes:) ****with the most accurate source for each data stream to avoid onboarding errors
Account & Access
- [ ] Check for VPP enrolment
- Look in OEM app/portal or ask customer
- If enrolled, advise customer to contact previous provider
- Send them this unenrolment email template
- [ ] Ensure customer knows their Alpha Cloud login and password
Customer Reminder (if joining Amber)
- [ ] During registration they need to:
- Enter the correct serial (starts with AL) and check code in the registration form.
- if they have multiple AlphaESS batteries, they will need to onboard their batteries separately
- This is often entered incorrectly and will block onboarding.
- [ ] Inform the customer about solar curtailment limits:
- DC-coupled: Eligible for solar curtailment
- AC-coupled: Not eligible
More details in our FAQ
▲ Back to top